Fast Lanes, Rishon LeZion Car Park

Israel, Rishon Lezion

infrastructures

Completed

Fast Lanes, Rishon LeZion Car Park

Israel, Rishon Lezion

infrastructures

Completed

Ashcrete has supplied industrialised prestressed beams as part of the construction of 3 levels in the Park and Ride car park at Rishon LeZion.

31,000sq.m.

Prestressed ceilings

3

Parking levels

2024

Completion of construction

Fast Lanes, Rishon LeZion Car Park
Fast Lanes, Rishon LeZion Car Park

Industrialised Elements for 3- Level Car Park

The Park & Ride car park at Rishon LeZion contains 4 levels offering thousands of parking spaces for drivers preferring to avoid traffic congestion at the approach to the city.

Ashcrete has supplied some 31,000 sq.m. of prestressed ceilings for 3 of the 4 parking levels. The ceilings were produced at the Company’s plant in Ashdod and transported to the construction site where they were mounted in the field. 

The Ashcrete plant operates about 20 production lines simultaneously, being a leader in the prestressed slab production sector in the country. Ashcrete prestressed slabs have a low weight, reducing the load on the structure, and are speedily and efficiently deployed on site.

product-image-1
product-image-1
product-image-2
product-image-2