Ashcrete has supplied prefabricated beams as part of the project for lowering into a cutting the LRT Purple Line along the Rafael Eitan section in Ramat Gan.

72

AASHTO beams

25-30m.

Length of beams

550cu.m.

Beams

Rafael Eitan Lowering Project
Rafael Eitan Lowering Project

Concrete Beams in a Roadway Lowering Project

As part of the LRT Purple Line construction in Ramat Gan, works to lower a section of Rafael Eitan Road into a 12 metre deep cutting were carried out.

Ashcrete produced 72 prefabricated beams with two types of AASHTO sections to serve as supporting elements for the excavation walls - a type of “pressure beam” for the cutting. The beams were manufactured on the production line with pretensioning, their length varying between 25 - 30 metres; a total volume of 550 cu.m. was produced. 