Railway Line Section

Israel, Elishama

infrastructures

Completed

Railway Line Section

Israel, Elishama

infrastructures

Completed

Ashcrete has supplied reinforced concrete industrialised elements as part of the laying of a section of the eastern rail alignment adjacent to the moshav Elishama in the Sharon area.

48

Elements

80tonnes

Weight of each element

11.2m.

Length of element

Railway Line Section
Railway Line Section

Concrete Industrialised Elements for Israel Railways Tracks

2020 saw the completion of the eastern rail alignment section passing by the moshav Elishama in the Sharon area. The section formed a roof over the structure protecting the National Water Carrier pipeline. Ashcrete produced 48 reinforced concrete industrialised elements 11.2 m. long by 2.5 m. wide by 1.1 m. high. Each element weighed 80 tonnes, their volumes totalling 1,480 cu.m. together. The elements were laid adjacent to each other to the original plan. 

product-image-1
product-image-1
product-image-2
product-image-2
product-image-3
product-image-3