Railway Line Section
Railway Line Section
Israel, Elishama
infrastructures
Completed
Concrete Industrialised Elements for Israel Railways Tracks
2020 saw the completion of the eastern rail alignment section passing by the moshav Elishama in the Sharon area. The section formed a roof over the structure protecting the National Water Carrier pipeline. Ashcrete produced 48 reinforced concrete industrialised elements 11.2 m. long by 2.5 m. wide by 1.1 m. high. Each element weighed 80 tonnes, their volumes totalling 1,480 cu.m. together. The elements were laid adjacent to each other to the original plan.